What each item with an active bill of materials costs to make, against its selling prices. Use it to check your prices still cover your costs when material prices go up. Settings: none. It always uses today’s costs.
BOM cost roll-up
The figures at the top are the number of items with an active BOM, how many sell below cost at their lowest price, and how many have no selling price.
The table lists each item with its BOM, the number of components, the cost per unit, its lowest and highest selling price, and the margin at the lowest price.
The cost per unit uses the average cost of the components in stock; for a component not in stock, its own BOM, or else its latest cost. Labour and overhead use the rate on the BOM.
Selling prices are the item’s prices across your price categories.
Completed production orders: what you planned against what you made, and what it cost against what the BOM says it should cost today. Settings: the From and To dates (by the date the order was completed).
Production variance
The figures at the top are the number of orders completed, the overall yield (produced ÷ planned) and the total cost variance.
The table lists each order with the planned and produced quantity, the yield, the actual cost (in total and per unit), the BOM cost per unit and the variance.
The actual cost is the material and labour booked to the order. The BOM cost is worked out with today’s costs, so a variance also includes price changes since the order was made.